Planner 0.14.2
==============

New features and fixes
======================
* fix bug #353232 - patch to raise majic priority, fixing nautilus behavior when clicking on a planner file
* fix bug #368186 - patch to paint guide lines behind project start date rather than on top - contributed by Arthur Petitpierre
* added -Wno-return-type for compile with database enabled
* patch related to bug #353213 - added #ifdefs to allow compile with libgda 1 or 2, up to libgda-1.9.102
* Added Arabic - contributed by Djihed Afifi
* fix for bug 358415 crash in gantt view, contributed by Arthur Petitpierre and mdpoole trolius org.


==============
Planner 0.14.1
==============

New features and fixes
======================
* new man page contributed by Martin-Eric Racine
* fix for bug #353213 - fix compile with libgda 1.3.91 - contrubuted by Dennis Lubert

* corrected build of translated user guides
* src/planner-format.c:  fix NULL pointer deref - bug #334121
* src/planner-gantt-row.c:  patch to fix segv on scrolling - bug #345517
* po/POTFILES.in:  Added missing files per bug #344793
* README: Put some better, more current info in there
* NEWS:  Updates since v0.13


============
Planner 0.14
============

New features and fixes
======================
 * FF and SF Predecessors 140561 (Kurt Maute)
 * Simple priority scheduling (Matteo Nastasi): 
   Use the --enable-simple-priority-scheduling option when building. 
   This feature will allow a high priority task to steal resources from a 
   lower priority task.
 * View Non-standard working/nonworking days (Matteo Nastasi): 
   In the Gantt view, this feature shows where resources have differences 
   in working and nonworking days when compared to the default calendar.
 * Resource Usage view canvas interactivity (Alvaro del Castillo):
   Right clicking on a usage bar or resource pops up an option menu.
 * Gantt chart misalignment with tree view 128983 (Francisco Moraes)
 * Summary tasks: work now equals sum of child tasks 305801 (Kurt Maute)
 * Eliminate effects of resource assignments on summary tasks 151604 
   (Kurt Maute): 
   Assigning a resource to a summary task now has no effect.
 * Updated user guide: (Kurt Maute)
 * View Grid Lines in Gantt view 303374 (Nguyễn Thái Ngọc Duy):
   Shows horizontal lines in Gantt to help visually line up tasks with 
   Gantt bars. 

New and Updated Translations
============================
Vladimir "Kaladan" Petkov (bg)
Miloslav Trmac (cs)
Hendrik Richter (de)
Kostas Papadimas (el)
Adam Weinberger (en_CA)
David Lodge (en_GB)
Francisco Javier F. Serrador (es)
Ivar Smolin (et)
Larra Murgoitio (eu)
Meelad Zakaria (fa)
Ilkka Tuohela (fi)
Gabor Kelemen (hu)
Takeshi AIHANA (ja)
Kjartan Maraas (nb)
"Last-Translator: \n" (ne)
Jan-Willem Harmanny (nl)
Afonso Celso Medina (pt_BR)
Steve Murphy (rw)
Marcel Telka (sk)
Данило Шеган (sr)
Daniel Nylander (sv)
Maxim V. Dziumanenko (uk)
Clytie Siddall (vi)
Woodman Tuen (zh_TW)